IEEE 125 – IEEE Recommended Practice for Preparation of Equipment Specifications for Speed Governing of Hydraulic Turbines Intended to Drive Electric Generators
Revision Standard – Superseded.The recommended specification was updated to include the latest practices on the North Americancontinent and the title was changed from a recommended specification to a “Recommended Practice for Preparation of Equipment Specifications. . . .”Insofar as possible, the Practice has been made consistent with the ASME Performance Test CodePTC29-1965 and the draft of the corresponding IEC document.