This procedure establishes the instructions to prepare tube ends and install and inspect axially swaged permanent tube fittings qualified to AS 5958. This procedure is applicable when specified on the engineering drawing or in the procurement document.
Product Details
Published:
07/09/2007
File Size:
1 file , 520 KB
Note:
This product is unavailable in Ukraine, Russia, Belarus